Skip to main page content

Check which options are available

Enter the BT phone number where you'd like us to install broadband -

That is not a valid phone number - it must start with 01, 02 or 03 and contain numbers only. That is not a valid postcode

Don't have a BT landline, see broadband with phone line packages

Just need broadband? See our broadband options

We’re sorry but is incompatible with broadband.

isn’t a BT number.

Either check a different number or take a look at our broadband + phone line packages.

Either check a different number or take a look at our broadband + phone line packages.

Now select your address

Pick your address

We're checking that now

Sorry - it looks like there's a problem with our checker tool.

We're working on fixing it right now. Please try again later.

Sorry - we couldn't confirm your address details.

Please call us on 0800 028 2075 so that so we can take a closer look.

We're open between 8am and 6pm - Monday to Friday (closed on public holidays).

Thank you for your interest.

Did you know that if you choose BT Broadband we will upgrade you to Fibre when it arrives at no extra cost!

View your BT Broadband Broadband choices
Start again Your details:

Estimated speeds

These are the maximum speeds you could get with our fastest products. Your actual speed may be less depending on local factors.

These are the maximum speeds you could get if you switched to our fastest products. Your actual speed may be less, depending on local factors.

Estimated speeds

These are the maximum speeds you could get with our fastest products. Your actual speed may be less depending on local factors.

Your business can benefit from superfast fibre broadband, fantastic!

The only slight hitch is that at the moment your line isn’t compatible with broadband so we’ll need to convert it for you, or you can buy a new one. It’s up to you. We’ll need to speak to you in person if you want to convert your line. To talk to one of our experts, please call us on: 0800 028 2075

Estimated speeds

You can get broadband from BT Business.

Estimated speeds

These are the maximum speeds you could get with our fastest products. Your actual speed may be less depending on local factors.

Estimated speeds

These are the maximum speeds you could get with our fastest products. Your actual speed may be less depending on local factors.

Broadband

-17Mbps download

1Mbps upload

See broadband options

Broadband

Not available

Fibre broadband

-56.8Mbps download

-10Mbps upload

See fibre options

Fibre broadband

Not available

Fibre broadband

Superfast fibre broadband isn’t available just yet.

BT Broadband BT Broadband Unlimited Popular choice BT Broadband Premium BT Infinity BT Infinity Unlimited BT Infinity Premium Popular choice BTnet Leased Line
Check availability Check availability Check availability Check availability Check availability Check availability View more
Description Budget is more important than speed or fibre isn't in your area yet
See all standard broadband
Superfast! Up to 9x faster than standard UK broadband
See all fibre broadband
Your own dedicated connection
Download speed up to 17Mbps 17Mbps 17Mbps -Mbps 38Mbps -Mbps 38Mbps -Mbps 76Mbps 10Gbps
Upload speed up to 1Mbps 1Mbps 1Mbps -Mbps 9.5Mbps -Mbps 9.5Mbps -Mbps 19Mbps 10Gbps
Price/month (24 months) £10.00 £17.00 £25.00 £25.00 £32.00 £40.00 From £170.00
Typical use Low-level email and web surfing User that needs unlimited data to send & download big files High internet user + IT support & Office 365 Small Business Fast speeds for efficient email and web surfing High internet user + wants unlimited data Fastest speeds for cloud-based software, handling big data, video Internet is critical to business
Usage 10GB Unlimited Unlimited 50GB Unlimited Unlimited Unlimited
Business traffic prioritised during busy periods Yes Yes Yes Yes Yes Yes Uncontended, so full speed at all times
Microsoft Office 365 Small Business No No Yes No Yes Yes No
Broadband connection charge £30
One-off connection fee
Inclusive Inclusive Inclusive Inclusive Inclusive Standard connection, fee on 3 /5 yr contract
Dedicated line No No No No No No Dedicated (uncontended)
Free BT Wi-fi Yes Yes Yes Yes Yes Yes No
Free 24/7 technical support Yes Yes Yes Yes Yes Yes Yes
Broadband fault fix target Within 2 working days By the end of the next working day By the end of the next working day Within 2 working days By the end of the next working day By the end of the next working day Within 5 hours
Resilience options No No No No No No Chargeable
Service Level Agreement No No No No No No Yes
BT Tech Heads extra IT Support No No Yes No No cross No
Router Hub 3 included
(£8 postage charge)
Hub 3 included
(£8 postage charge)
Hub 3 included
(£8 postage charge)
Award-winning
Hub 5 included
(£8 postage charge)
Award-winning
Hub 5 included
(£8 postage charge)
Award-winning
Hub 5 included
(£8 postage charge)
Managed Cisco router
Email 10 addresses 10 addresses 10 addresses 10 addresses 10 addresses 10 addresses No
Static IP address £ extra £ extra £ extra £ extra £ extra £ extra Included
Webspace 50MB 50MB 50MB 50MB 50MB 50MB No
Domain name No No No No No No 10 primary, 250 secondary
Check availability Check availability Check availability Check availability Check availability Check availability View more
Show moreless features

For sales, call 0800 028 2075

We're open between 8am and 6pm - Monday to Friday (closed on public holidays).

FAQs

  • How can the Broadband Connection Voucher Scheme help pay for my fibre or leased line?

    The scheme is a government initiative that helps small businesses in certain cities get faster internet speeds.

    Eligible businesses can get £120 off superfast fibre broadband or up to £3000 off a leased line.

    Use our eligibility checker to see if you can take part where you are.

    Does ‘Unlimited' really mean unlimited?

    Yes!

    When will I be able to get superfast fibre broadband?

    Take a look at our fibre availability checker to see which of our fibre products are available at your premises.

    If you've already done that and found that it's not yet available, check the Openreach site to find out the superfast fibre broadband rollout plans for where you are.

    How do I upgrade my existing broadband?

    You can upgrade your broadband or fibre online at any time.

    1. See what's available by using our broadband and fibre checker

    2. Use the Order now buttons to order the new broadband or fibre online

    When you upgrade you'll start a new contract that will run for 12 or 24 months (depending what you choose) from when you upgrade.

    How do I access the more than 5 million BT Wi-fi hotspots around the UK?

    Select the BT Wi-fi network from the available networks on your device then login with your ‘@btconnect.com' details (we gave you these when you joined us).

    To make it really easy, there's also a BT Wi-fi app.

    Find out more with our BT Wi-fi FAQs and videos

  • How will you help me keep track of how much data I'm using?

    If you're on either of our limited services, BT Broadband (10GB limit) or BT Infinity (50GB limit), we'll send you an email when you're close to using 80% of your data allowance.

    You can also keep an eye on your usage by logging into your My BT Business account. Then go to Manage Services and click on Broadband Checker.

    Why not stop worrying about data usage altogether by upgrading to one of our Unlimited broadband or fibre options?

    1. See what's available by using our broadband and fibre checker

    2. Use the Order now buttons to order the new broadband or fibre online

    How long will it take to get my broadband up and running?

    It depends on what you’re after and local availability, but our minimum
    lead times are –

    To switch broadband from another supplier
    10 days

    To switch broadband and phone line from another supplier
    10 days

    Change from BT home broadband to BT business broadband
    5 days

    Install new phone line and broadband
    10 days

    How easy is it to install fibre or broadband?

    Very!

    We do all the work at the exchange and in the street cabinet.

    Depending on the product you order and the speeds available at your premises, you'll either plug in the BT Hub yourself or we'll send an engineer out to you.

    The Hub comes with simple instructions so you shouldn't have any problems. And if you're an existing Infinity customer upgrading your package, you don't need to do a thing – stick with your existing Hub, and we'll take care of the rest.

    How quickly will I be back up and running if something goes wrong?

    It depends on the type of broadband or fibre that you have. The response times shown here assume that you report the fault to us (either online or by phone call) before 6pm on a working day.

    BT Broadband and BT Infinity
    We'll fix your fault within 2 working days of you reporting the fault to us.

    BT Broadband Unlimited, BT Broadband Premium, BT Infinity Unlimited, and BT Infinity Premium
    We'll fix your fault by the end of the next working day.

    How do I buy more licenses for my Microsoft Office 365 Small Business account?

    You can add more licenses by logging into your My BT Business account and going to Manage Services.


  • Things you need to know

    Terms & conditions

    BT Business Broadband

    Conditions for BT Business Service

    Service schedule for BT Business Broadband Access Service
    Charges Schedule for BT Business
    Conditions for BT Business Services and Service Schedule for BT Business Broadband Access Service also apply.
    Customer Service
    Compensation Scheme These terms apply only to customers who ordered on or after 30th October 2010.
    Traffic Management

     

    BT Business Broadband Access Service

    Business Email Lite powered by Microsoft Office 365

    BT Business Lite Web Hosting & Business Email Lite powered by Microsoft Office 365
    0800/0844 number rental is subject to BT Inbound Contact UK Conditions
    Mobile broadband terms

    Will I need a new router?

    You'll need a router to get up and running, but don't worry. If you're a new customer you'll receive either our Hub 3 or Hub 5 - depending on whether you're going for broadband or superfast fibre broadband.

    If you're an existing broadband customer and you've upgraded to superfast fibre broadband, we'll send you out a brand new Hub 5.

    If you're an existing broadband or superfast broadband customer and you want to change your monthly subscription, but not the type of broadband (broadband or superfast broadband) you're using, then you can carry on using the hub you already have. This saves you the hassle of installing a new one.

    Why do we have different prices?

    Our costs vary from place to place so depending on where your business is, you may see higher, or lower, prices.

    Support

    All of our Unlimited and Premium subscriptions come with Prompt Care service as standard.

    This means that in the unlikely event that you have a problem, if you report it before 6pm we’ll aim to fix it by the end of the next working day, Monday to Saturday.

    If we're late in fixing the fault, you may be eligible to claim £25 off your next bill through our Customer Service Compensation Scheme.

    Here's the detail:

    We aim to fix faults reported Monday to Saturday by 23.59 on the next working day.

    The broadband Customer Service Compensation Scheme covers BT Business Broadband Unlimited, BT Business Broadband Premium, BT Business Infinity Unlimited and BT Business Infinity Unlimited.

    • You must have reported the fault to us (and have a fault reference number).
    • Make sure you claim within 90 days of us fixing the fault.
    • If your claim is successful, we'll credit your next bill with £25.
    • Check the full details of the scheme if you want to know more (and to read about the exclusions to it).

    If you choose one of our plans with a data allowance: BT Business Broadband or BT Business Infinity, and you let us know there's a problem before 6pm, we'll aim to get it fixed within two working days.

    Engineer appointments

    If an engineer needs to visit your premises, you'll be able to choose an appointment between 8am and 1pm or between 1pm and 6pm, Monday to Friday. We don't make appointments for bank holidays.

    The engineer will arrive to start the work during these times. They may not finish the work until after the end of the time slot.

    If we don't need to send an engineer, your fibre broadband will start working at some point before midnight on the day of activation (we'll tell you about that when you place your order).

    See our terms & conditions

    FREE unlimited access to over 5 million wi-fi hotspots around the UK

    You can start using the BT Wi-fi hotspots as soon as you’ve confirmed your order (that's right: you don't even need to wait for us to install your broadband!).

    Just login with your '@btconnect.com' details and you'll be away.

    99.99% reliability

    Network reliability as of March 2015.

    Microsoft Office 365 Small Business license included as standard with Broadband Premium, Infinity Unlimited and Infinity Premium subscriptions

    BT Business Broadband Premium, BT Business Infinity Unlimited, BT Business Infinity Premium all include one user license for Microsoft Office 365 Small Business. Read more about it here. This gives you access to Professional Office applications so you can create and access documents and business-class email securely anytime, anywhere - on any device.

    Because Office 365 is run from the cloud you won't need to worry about updating to a new version - ever. All that is taken care of, so you'll know you're always using the most up to date versions of programs like Word and Excel.

    You can easily upgrade to Microsoft Office 365 Small Business Premium if you want to. You'll only pay an extra £4 each month. You can add more licenses for either Microsoft Office 365 Small Business or Microsoft Office Small Business Premium if you need to.

    You'll need a domain name to get going with Microsoft Office 365. This can be the domain name you've already got, or we can sort one out for you.

    Extra IT support with Tech Heads with Premium products

    You'll get BT Tech Heads included as standard with BT Business Broadband Premium and BT Business Infinity Premium, giving you technical support on a wide range of IT issues for up to 3 computers. This is on top of the Prompt Care you'll receive for any broadband faults.

    We can help you with a whole range of broadband and IT questions and issues. And when things get tricky, we can securely takeover your computer to sort out problems and show you what to do.

    Tech Heads is available 24/7 and it’s free to call.

    Tell me more about the speeds I can get with superfast fibre broadband

    There are several factors that can affect your speed, including:

    • Distance between your premises and your telephone exchange
    • Distance between your installation point and the green cabinet in the street
    • The condition, length, and amount of your internal wiring
    • The equipment you're using

    You'll get a more consistent speed with fibre broadband than you would with standard broadband.

    Speed may vary at certain times. See our terms & conditions for details.

    BT Business Infinity and BT Business Infinity Unlimited

    Speeds based on BT Infinity and BT Infinity Unlimited average customer speeds and UK average standard (ADSL) broadband speed from Ofcom broadband research conducted in May 2013, and published in the August 2013 Ofcom report.

    BT Business Infinity Premium

    Speeds based on BT Infinity Premium average customer speeds and UK average standard (ADSL) broadband speed from Ofcom broadband research conducted in May 2013, and published in the August 2013 Ofcom report.

    What you need to get online with superfast fibre broadband

    To get superfast fibre broadband you’ll need a BT phone line. If you've already got standard broadband installed on it we'll just upgrade the service to superfast fibre broadband, if it's available.

    The UK's favourite business broadband

    Based on market share. Business broadband market size taken from Ofcom Communications Market Report 2013 - 1st August 2013.